Chicago, IL
We provided a new cooling system for a university dining hall, with a focus on cost savings and energy efficiency. The project was completed on time, within budget, and with minimal disruption to regular campus life.
For this 23-story luxury hotel, we provided design-build mechanical and electrical services. The project renovated an HVAC system for 221 guest rooms, helping to significantly increase system dependability and performance.
The high-efficiency independent cooling systems built for this office building provides precise temperature control for the facility’s nine, mission-critical LAN server rooms and resulted in a $60,000 rebate.
The high-efficiency industrial burner we installed for this chemical manufacturing plant in Ringwood, IL saved the facility 200,000 therms in one year. After installation, we helped the client secure a $65,000 rebate.
For this aggressively scheduled design-build project, we installed a highly advanced, medical-grade air cooled chiller that will serve the LINAC equipment at this healthcare facility’s oncology and cancer treatment department.
When a 500-ton absorption chiller failed, we sprang into action, providing a comprehensive emergency cooling plan that saved hundreds of long-term, temperature-sensitive experiments and research.
In serious need of mechanical upgrades, this Chicago condominium turned to Team Mechanical for an upgrade that would increase efficiency and address disruptive noise and vibration that was disturbing residents.
The upgrades to this mixed-use space’s central heating and cooling plant will significantly boost plant efficiency, improve indoor air quality, and promote occupant comfort— and also resulted in $8,000 in rebates.
Three packaged rooftop units were replaced at this seven-story, multi-tenant office building. The project was completed over the course of a single weekend, in order to avoid any interruptions to the building’s regular operation.
We offered end-to-end installation services for a new rooftop unit, which will replace the building’s poorly functioning, more than 25-year-old unit. The completed project will improve efficiency and occupant comfort.
We installed cutting-edge air ionization equipment at a prestigious academic medical center. The technology helped eliminate odors from back-up generators and a helicopter pad, while also improving IAQ, occupant comfort and health, and system efficiency.